Featured downloads

Tools you can use on your next project

Use these resources to align stakeholders early, reduce RFIs, and keep documentation consistent through design and construction.

Healthcare Electrical Design Kickoff Checklist

A structured agenda for early coordination: clinical adjacencies, redundancy expectations, infection control constraints, and critical system interfaces.


Low-Voltage Coordination Guide

A quick reference for pathways, telecom room planning, device coordination, and documentation practices that support clean installation and long-term maintainability.


Lighting & Controls Planning Notes

Key decisions to make early—control intent, zoning, emergency lighting considerations, and how to coordinate with architectural and clinical requirements.


Power Study Inputs & Deliverables (SKM/ETAP)

What we typically need to start, what we produce, and how study outcomes inform equipment selection, settings, and distribution resilience.

Resource FAQ

Answers to common questions about how we publish and use these materials.

Are these resources specific to California and Hawaii?

They are written with California and Hawaii project realities in mind, but most guidance is broadly applicable. Always confirm requirements with the Authority Having Jurisdiction (AHJ) and your project’s governing standards.

Can Merollo tailor a checklist to our standards?

Yes. We can adapt kickoff agendas, drawing standards, and coordination checklists to match your team’s workflows and deliverable expectations.

Do you provide stamped engineering?

Project requirements vary. We’ll confirm licensing, scope, and responsible-charge expectations during discovery and align the team accordingly.

How do you handle confidentiality on healthcare projects?

We share guidance in general terms and anonymize examples. Project-specific information is handled under appropriate confidentiality requirements.

What’s the best time to engage for power studies?

Early. Study assumptions and one-line intent can influence equipment selection, feeder sizing, and coordination strategy—reducing late-stage redesign.

Do these resources replace code review or peer review?

No. These materials support planning and coordination but do not replace formal code analysis, peer review, or owner/AHJ requirements.

Get help applying this guidance

Want a project-specific review?

Send a note and we’ll follow up to discuss scope, schedule, and the right level of support—electrical, low-voltage, lighting/controls, or power studies.

Construction professionals reviewing plans together

Build a dependable electrical design package—without surprises

Engage Merollo for healthcare-focused design and quality-first delivery across California and Hawaii.